Assessment #1
- Create a scenario for a company’s request for a Projection Analysis Timeline. Begin the assignment with a brief summary of the scenario.
- Write a Projection Analysis Timeline Memo with a Gantt Chart.
The Projection Analysis must include the following:
- At least 4 major factors.
- 4 sections: Introduction, Analysis of Factors, Considerations, Limitations.
The Gantt Chart must illustrate the factors and their corresponding dates.
Grading Rationale:
Summary of scenario. |
10 out of 100 |
Content: The Projection Analysis defines at least 4 major factors. Each factor is worth 5 points each. |
20 out of 100 |
Content: Format includes 4 sections_ Introduction, Analysis of Findings, Considerations, and Limitations, which is presented in an easily accessed technical format. See and follow the example. |
30 out of 100 |
Gantt Chart illustrates 4 major factors and corresponding dates. |
30 out of 100 |
Language, punctuation, and sentence structure. |
10 out of 100 |